Skip to main content
ENGINEERING IDEAS INTO REALITY
Government agency

Contracted Active Directory maintenance for a government agency

We maintained a government agency's Active Directory system, which centrally manages user accounts and access, under a 2025–2026 contract. The 4 main areas were scheduled preventive maintenance, incident response, configuration reviews, and renewal of account-management software licenses, with contractual reports.

Concept illustration: inspection and maintenance of an organization's user account systemEnlarge image
AI-generated concept illustration explaining the work in this case
Industry
Government
Year
2025–2026
Scope of work
Active Directory system maintenance in 4 main work areas: scheduled system checks (PM), fixes on notification (CM), system configuration review, and renewal of the user account management software licence, with reports delivered by contract instalment.
Duration
12 months

Summary

  • Inspektion provides Active Directory system maintenance for a government agency under a service contract in 2025–2026.
  • The contract scope covers 4 main work areas: scheduled system checks (PM), fixes on notification (CM), system configuration review, and renewal of the user account management software licence.
  • The contract scope requires reports by instalment. Acceptance of the final instalment and the report details are still awaiting confirmation.
  • This page does not disclose the agency's name, number of users or system configuration, because this is the agency's security information.
01

The on-site brief

The agency needed its user account and access rights system to be available throughout the contract term, with system check cycles, procedures for fixing problems when they occur, and reports that can be tracked. The agency's data and system configuration must be kept confidential.

02

What we did

We provide services in 4 main work areas under the contract scope: scheduled preventive maintenance (PM), fixing problems (CM) when notified, system configuration review, and renewal of the user account management software licence. We then prepare reports for delivery by contract instalment.

03

Results

We hold documents for the service and for the work delivered by instalment under the contract. Acceptance of the final instalment and the details of the reports delivered are still awaiting confirmation, so we do not yet claim that the work has passed acceptance for the full contract.

How the brief came about

This work is maintenance of an Active Directory system the agency already uses, not the installation of a new system. Users must go through this system to sign in to computers and to authenticate with connected work systems.

What is Active Directory?

Active Directory is an organisation's central system for managing user accounts and access rights. System administrators use it to set who can sign in to which computers or systems. When this system has problems, users may be unable to sign in to their work systems.

Requirements and constraints

The main constraints of this work are that every instalment must have evidence for the agency to accept, and that system information must be confidential. Maintenance work leaves no tangible deliverable to inspect, so the report is what the agency uses to accept the work of each instalment.

  • The work of each instalment must have a report in the format set by the contract, to support acceptance.
  • Problem fixes must stay within the scope of the contract.
  • Renewal of the user account management software licence must be completed on time.
  • The agency's data and system configuration must be confidential, both in reports and in external communication.

Why must a maintenance contract separate PM work from CM work?

The contract must separate PM work from CM work because the two types of work start differently and are measured differently. PM (Preventive Maintenance) is checking work on a schedule planned in advance, while CM (Corrective Maintenance, meaning fixing problems when they occur) starts when the agency reports a problem. Separating the two lets the report for each instalment show clearly what was checked according to plan and what was fixed on notification.

System configuration reviews and software licence renewals do not occur in every check cycle, so the scope of work lists these two tasks as items of their own. The steps below are the main work under the contract scope.

  1. 1

    Scheduled system checks (PM)

    Check the operation of the user account system at the cycle set by the contract, then record the results in the report.

  2. 2

    Fixes on notification (CM)

    Receive problem reports from the agency, fix them according to the contract scope, and record the corrective work in the report.

  3. 3

    System configuration review

    Review the configuration of the user account system according to the scope of work, and report the results to the agency.

  4. 4

    Software licence renewal

    Renew the user account management software licence as set by the contract.

Deliverables

The deliverables under the contract scope are the maintenance service and reports by instalment, as follows:

  • Scheduled system check service (PM)
  • Fix-on-notification service (CM) according to the contract scope
  • System configuration review, with a report of the results
  • Renewal of the user account management software licence
  • PM and CM reports by contract instalment

This list is the scope under the contract. The details of the reports delivered in each instalment are still awaiting confirmation.

Confirmed results

What the documents can confirm is billing by contract instalment. We hold invoices and receipts for the instalment work. This page does not show amounts or document numbers, because the agency's contract information must be confidential.

The documents we hold contain no measured figures, such as system availability time or the number of problems fixed, so we report only the scope of work and the delivery status.

What we learned

The key principle from this work is that the scope must separate scheduled work from corrective work, and every instalment must have agreed delivery evidence. The full set of principles is as follows:

  • The scope must separate scheduled work, fixes on notification, and work that does not occur in every cycle, such as system configuration reviews and software renewals. Each part should have its own report format, because the report is the evidence of each instalment's work.
  • Set out the delivery evidence for each instalment in the contract, such as PM and CM reports and acceptance documents, because maintenance work leaves no tangible deliverable to inspect afterwards.
  • For security work, agree from the outset which information may be disclosed. External reports and project references should state only the service scope, without revealing the structure or configuration of the system.

How can you apply this approach to your organisation's user account system?

If your organisation uses Active Directory and needs a maintenance contract, you can use the division of main work in this case as a starting point. What needs adjusting is the check cycle, the list of systems in scope, and the report format your organisation requires.

Reusable parts and parts that need adapting

Part of the workReusableNeeds adapting when
Scheduled system checks (PM)Separating scheduled checks from corrective work, and reporting results for every instalmentYour organisation sets a different check cycle or check list from this case
Fixes on notification (CM)The process of receiving reports, fixing problems and recording the work in the reportYour organisation's response time conditions must be stated clearly in the contract
System configuration reviewConfiguration review as a separate item in the scope of workYour environment has other systems connected to user accounts, so you must specify which systems are in scope
Software licence renewalIncluding renewal in the same contract as the maintenance workThe software you use differs from this case, so check the list and due dates first
Reports and confidentialityReports by instalment, and not disclosing system configurationYour organisation has its own report forms or data policy
  • Prepare a list of the systems and software you want in scope, with the licence due dates
  • Agree the conditions for the service provider's access to systems and data before work starts
  • Define the report format and acceptance documents for each instalment clearly in the contract from the start

Technology used

Active DirectoryPreventive maintenance (PM)System fixes when problems occur (CM)System configuration review

Frequently Asked Questions

What does the Active Directory maintenance service in this case cover?

It covers 4 main work areas: scheduled system checks (PM), fixes on notification (CM), system configuration review, and renewal of the user account management software licence, with service reports by contract instalment.

How does PM work differ from CM work?

PM is checking and maintenance on a schedule planned in advance, while CM is fixing problems when the agency reports them. A contract that separates the two lets the report for each instalment show what was checked according to plan and what was fixed on notification.

Has this work passed acceptance for the full contract?

This cannot be confirmed yet. Acceptance of the final instalment is still awaiting confirmation from documents. We will state that the work has passed acceptance for the full contract only once we have documents confirming it.

Why does this page not name the agency or give system details?

User account system information is the agency's security information and must be kept confidential. This page therefore shows only the service scope, without showing the agency's name, number of users or system configuration.

What information should be prepared before requesting a quotation for this kind of maintenance work?

Prepare a list of the systems you want in scope, the software to be renewed with its due dates, the check cycle you want, and the report format your organisation uses. Then contact us to assess the scope of work together.

Want a system like this for your work?