Supply of PLC sets and network switches for Tower Lamp work on the packing line of an FMCG food factory in Thailand
Customer: Multinational consumer goods (FMCG) manufacturer
We supplied and delivered 25 sets of Siemens LOGO! PLCs with 5-port network switches and LAN cables to an FMCG (consumer goods) food factory in Thailand in 2023. The equipment was ordered for Tower Lamp signal light work and for syncing barcode scanner data on the packing line into the factory's CIM system. We delivered everything in 2 batches.
- Industry
- FMCG
- Year
- 2023
- Scope of work
- Supply and delivery of Siemens LOGO! PLCs (4 relay outputs, with Ethernet port), 5-port Gigabit network switches, and LAN cables and connectors, 25 sets of each (first batch 10 sets, second batch 15 sets). The items in the quotation and purchase order for these sets are all equipment. In the same year there was a separate purchase order: 32-inch displays with stands and Raspberry Pi kits, 2 sets of each, with the Raspberry Pi configured for use with the displays.
- Duration
- Delivered in 2 instalments, July–August 2023
Summary
- We supplied and delivered 25 sets of Siemens LOGO! PLCs with 5-port network switches and LAN cables to an FMCG food factory in Thailand in 2023.
- The equipment was ordered for Tower Lamp signal light work and for syncing barcode scanner data on the packing line into the factory's CIM system.
- Delivered in 2 batches under a single purchase order: 10 sets in July and 15 sets in August 2023. Every batch has delivery documents.
- Our role in this work was to supply and deliver the equipment. The items in the quotation and purchase order for these sets are all equipment.
- In the same year there was a separate purchase order for 32-inch displays with stands and Raspberry Pi kits, 2 sets of each, with configuration.
The on-site brief
The factory needed 25 identical equipment sets for its packing line, for use with Tower Lamp signal light work and for syncing barcode scanner data into the CIM system (Computer Integrated Manufacturing, a system that brings together the factory's production data). The purchase order already specified the models and quantities of equipment for every set.
What we did
We sourced 25 sets of equipment matching the models in the purchase order. Each set has a Siemens LOGO! PLC, a 5-port Gigabit network switch, and LAN cables and connectors. We then delivered them in 2 batches under a single purchase order.
Results
All 25 sets were delivered in 2 batches: 10 sets in July 2023 and 15 sets in August 2023. Every batch has delivery documents referring to the same purchase order, and the annual project summary for 2023 records the work as completed.
Measured results
- PLC sets with network switches delivered (sets)
- 25
How the brief came about
An FMCG food factory in Thailand needed 25 identical sets of control and network equipment for its packing line. The project name states that they were for Tower Lamp signal light work, while the purchase order describes them as hardware for syncing barcode scanner data on the packing line into the CIM system.
CIM (Computer Integrated Manufacturing) is a system that brings a factory's production data together in one place. The documents for this work do not state at which point on the line each set is installed.
What is a Tower Lamp?
A Tower Lamp is a multi-colour column signal light mounted on a machine or workstation. It shows status by light colour, such as normal operation, stopped or a problem, and people on the line can see it from a distance. The light is generally driven through the output of a controller such as a PLC.
Requirements and constraints
The main requirements of this work came from the purchase order, which already specified the models and quantities of equipment for every set.
- The purchase order specified the same models for every set: a Siemens LOGO! PLC, a 5-port Gigabit network switch, and LAN cables and connectors.
- A single purchase order covered all 25 sets.
- The items in the quotation and purchase order for these sets are all equipment.
Why every set uses the same equipment models
Every set uses the same equipment models because the purchase order specified the same models for every set. We sourced and delivered all 25 sets to match those models.
For factories in general, using the same equipment model at every point helps with spare parts, because a failed set can be replaced with the same model of equipment using the same configuration.
What each delivered equipment set contains
Each equipment set has a PLC, a network switch, and LAN cables and connectors. We delivered 25 sets in total. The details are as follows.
Equipment in each set
| Equipment | Details | Total quantity |
|---|---|---|
| PLC Siemens LOGO! | Small programmable controller (Programmable Logic Controller) with 4 relay outputs and an Ethernet port for network connection | 25 sets |
| Network switch | 5-port Gigabit, for connecting the PLC and other devices to the same network | 25 sets |
| LAN cables and connectors | Network cables and connectors for linking the equipment in the set | 25 sets |
In 2023 we also delivered 32-inch displays with stands and Raspberry Pi kits (small single-board computers), 2 sets of each, with the Raspberry Pi configured for use with the displays. This work was under a separate purchase order. The documents do not state that the displays show data from the PLC sets above.
The batched delivery process
We delivered the first batch of 10 sets in July 2023 and the second batch of 15 sets in August 2023 under a single purchase order. The sequence of work was as follows.
- 1
Issue the quotation
Propose the equipment models and quantities per set as the factory required, 25 sets in total.
- 2
Receive the purchase order
The factory issued a single purchase order covering all 25 sets.
- 3
Deliver the first batch
Delivered 10 sets in July 2023 with delivery documents.
- 4
Deliver the second batch
Delivered a further 15 sets in August 2023, completing the purchase order.
Results confirmed from the delivery documents
The confirmed results of this work are delivery of all 25 sets under the purchase order; each of the 2 batches has delivery documents referring to the same purchase order, and the annual project summary for 2023 records the work as completed.
This case is an equipment supply job. We have no documents on performance in use after delivery, so we report only the delivery backed by documents.
What we learned
This work offers the following principles for supplying control and network equipment across multiple points.
- Specify the same equipment models for every set from the purchase order onwards. Identical sets can use the same PLC program and network configuration.
- Separate equipment items from service work clearly in the quotation. If you need programming or on-site installation, list it as a separate item, so that the buyer and seller share the same understanding of the scope of work.
- A single purchase order stating the models and quantities per set serves as the reference document for acceptance of every batch. When the documents for every batch refer to the same purchase order, checking the outstanding balance is straightforward.
How this approach can apply to your factory
If your factory needs to place signal lights or connect barcode scanners to a central data system at multiple points, you can define one standard equipment set and order the quantity you need under a single purchase order. What needs adjusting is the equipment model and scope of work, when your signal count or network differs from this case.
Reusable parts and parts that need adapting
| Part of the work | Reusable | Needs adapting when |
|---|---|---|
| Equipment set | Identical sets of PLC, network switch and LAN cables | If the number of input and output signals per point exceeds what this PLC model supports, a new model must be selected. |
| Network | Network switches for connecting the PLC and other devices to the same network | If the factory's network layout or rules for connecting new devices differ from this, agree with the IT team first. |
| Scope of work | Supply and delivery under the purchase order | If you want us to program, install or test on site, it must be listed as a separate item. |
| Delivery | Split delivery in batches under a single purchase order | If your on-site installation plan differs from this, the quantity per batch must be redefined. |
- Count the input and output signals each point needs, then compare them with the chosen PLC model.
- Check the factory's network layout and the permissions for connecting new devices to CIM or the central data system.
- State clearly whether you want supply only, or programming and installation as well.
Read more
- AI and IoT system installation service for factories
- AI / IoT consulting and system design service
- Case: connecting automatic scales on a packing line to a production database
- Case: real-time Data Views displays at the line
- Article: how an IO Isolation Board is designed for safety
- DoLINE: production display software for the line
Technology used
Frequently Asked Questions
In this work, did Inspektion also program the PLCs or install on site?
The items in the quotation and purchase order for this work are all equipment. If your factory needs us to design, program or install on site, state this in the scope of work and request a quotation.
What does each equipment set include?
Each set has a Siemens LOGO! PLC (4 relay outputs, Ethernet port), a 5-port Gigabit network switch, and LAN cables and connectors, 25 sets in total.
Can delivery be split into batches?
Yes. In this case we delivered 2 batches under a single purchase order: the first of 10 sets in July 2023 and the second of 15 sets in August 2023. Every batch has delivery documents.
Are the displays and Raspberry Pi related to the PLC sets?
They were a separate purchase order from the same customer in 2023, consisting of 32-inch displays with stands and Raspberry Pi kits, 2 sets of each, and configuration for use together. The documents do not state that the displays show data from the PLC sets.
How much does it cost?
The price depends on the models, quantity and scope of work (supply only, or including installation). Please contact our team to request a quotation.